Press office

Access to the latest News.

Energy for reindustrialisation
Red Eléctrica commissions the Saguntum 220 kV sub-station, key to the industrial development of the Valencian Community
The Hernani–Argia electrical interconnection with France is upgraded using cutting-edge technology
Beatriz Corredor, Borja Sánchez, and Adriana Lastra visit the dismantling works of the Lada–Velilla line in Asturias
Red Eléctrica commissions the expansion of the Cofrentes substation to drive the energy transition in Valencia
Pedro Sánchez and Beatriz Corredor visit the new 132 kV Virgen de África substation in Ceuta for the interconnection with the Spanish peninsula

Red Eléctrica on social networks

Follow us on X

Icono

Follow us on YouTube

Icono

Follow us on LinkedIn

Other communications

It follows the status of access and connection of renewable generation, as well as other relevant data of the spanish electricity system.

Data available only in Spanish

Criteria for reporting economic-financial, non-financial and corporate information.

More info

Red2030 Blog

A space for debate on the 2030 Agenda and the Energy Transition.

Available only in Spanish
sala_de_prensa_image2

Have you tried our Red al día service?

Subscribe to the news