Press office

Access to the latest News.

Video library

Here you can find all the audio and video materials we produce regarding the different events and projects that Red Eléctrica undertakes. This audio-visual information, which can de downloaded, includes, when necessary, links and supplementary documentation.

15/07/2026

Key pillars of the 2026–2029 strategic plan

(Only available in Spanish)

Go to the detail
01/01/2005

Partial burying of the 400 kV line San Sebastián de los Reyes-Loeches-Morata - 'Barajas Plan'

In 2002 the enlargement works of Madrid's Barajas airport began, the new T-4 terminal and two new runways. Said infrastructures were affected by the fact that a part of the 400 kV line (double circuit San Sebastián de los Reyes-Loeches-Morata).

01/01/2004

The electric control centre (Cecoel)

The electric control centre (Cecoel) is responsible for the operation and coordinated real-time monitoring of the generation and transmission facilities of the Spanish electricity system.

01/01/2001

Live-voltage works

Red Eléctrica, since its founding, has sought to continuously improve the availability of the electricity transmission facilities.