Press office

Access to the latest News.

Video library

Here you can find all the audio and video materials we produce regarding the different events and projects that Red Eléctrica undertakes. This audio-visual information, which can de downloaded, includes, when necessary, links and supplementary documentation.

15/07/2026

Key pillars of the 2026–2029 strategic plan

(Only available in Spanish)

Go to the detail
23/09/2014

Electricity link project Majorca-Ibiza

MAJORCA − IBIZA electricity interconnection: a pioneering interconnection and a technological challenge of the highest order.

25/05/2014

Almacena project

The project consists of the field installation of an energy storage system, specifically a lithium-ion prismatic battery with a power in the range of 1 MW and a capacity of at least 3 MWh.

05/10/2013

Educational programme 'A Highway Behind the Wall Socket' in Castilla y León, from June 2011 to January 2012

As a result of the presence of the travelling exhibition "A Highway Behind the Wall Socket" at the Valladolid Science Museum, Red Eléctrica launched an educational programme.

01/06/2012

ROMULO: electricity interconnection between the Spanish peninsula and the Balearic Islands

The electricity interconnection between the Spanish peninsula and the Balearic Islands is a project which is key to ensuring and improving the reliability of the electricity supply of the Balearic system given its unique nature.

01/04/2012

Educational program 'A highway behind the socket' in Castilla y León, from June 2011 to January 2012

Due to the presence of the exhibition "A highway behind the socket" in the Science Museum of Valladolid, Red Eléctrica launched an educational program.