Discover what Red Eléctrica is, what we do, and why we are the backbone of the electricity system in Spain and the ecological transition.
These results reflect the homogeneous activity of the 2012 and 2013 financial years, that is, they eliminate non-recurring items of both years and the impacts of exceptional events that occurred in
The REMO Project, the electricity interconnection between Spain and Morocco, commenced in 1997 with the installation of the first electricity line and concluded with the commissioning of a second line in June 2006.
In Spain we have the world's first centre that controls renewable energy generation.
Red Eléctrica presents an interactive tour that invites visitors to participate, experiment and discover what electricity is, how it is generated and transported and how to consume it in a sustainable manner.
At the precise instance in which we turn on the light, a power station must generate the energy required to meet that need.
This interconnection will reinforce the security of both electricity systems and will favour the integration of a greater volume of renewable energy, especially wind power energy coming from the Iberian system.
Due to the presence of the exhibition "A highway behind the socket" in the Science Museum of Valladolid, Red Eléctrica launched an educational program.
In 2002 the enlargement works of Madrid's Barajas airport began, the new T-4 terminal and two new runways. Said infrastructures were affected by the fact that a part of the 400 kV line (double circuit San Sebastián de los Reyes-Loeches-Morata).
Red Eléctrica, since its founding, has sought to continuously improve the availability of the electricity transmission facilities.