509 resultados con "2025 Iberian Peninsula blackout"

2010 marked the recovery of the demand for electricity, which grew 2.9% compared to 2009 and was in line with the improvement in the economic activity in Spain.

The demand for electrical energy on the Spanish peninsula reached 22,004 GWh in the month of July, representing a drop of 1.1% with respect to the same month in 2010.

The demand for electrical energy on the Spanish peninsula during August reached 21,508 GWh, an increase of 0.1% above that registered in the same month in 2010, after two months in which decreases