509 resultados con "2025 Iberian Peninsula blackout"

The demand for electrical energy on the Spanish peninsula was 21,897 GWh in the month of February representing an increase of 6.1% with respect to the same month last year.

The demand for electrical energy on the Spanish peninsula was 22,695 GWh in the month of March, representing an increase of 8.9% with respect to the same month last year.

The demand for electrical energy on the Spanish peninsula was 20,445 GWh in the month of May, representing an increase of 4.9% with respect to the same month in 2009.

The demand for electrical energy on the Spanish peninsula reached 20,415 GWh in the month of June, representing an increase of 3.7% with respect to the same month in 2009, and a growth of 0.2% in g