For 40 years, we've been driving our country's economic and social progress. Four decades shaping Spain.
Red Eléctrica de España has awarded to the Norwegian company Nexans, for an amount in excess of 90 million euros, the design, manufacturing and future installation works of one of the two cables of
In the month of December, gross demand for electrical energy on the Spanish peninsula was 21,655 GWh, representing a fall of 7.4% with respect to the same month in 2010.
- 1,705 km of new lines in the national transmission grid
- On the Spanish peninsula, installed power capacity in generation facilities grew 1,879 MW.
The demand for electrical energy on the Spanish peninsula in the month of January dropped, after having factored in the seasonal and working patterns, 2.5% with respect to the same month last year.

The electricity interconnection between the Spanish peninsula and the Balearic Islands is a project which is key to ensuring and improving the reliability of the electricity supply of the Balearic system given its unique nature, having 2 small subsystems and being isolated, from an electricity standpoint.
The ratings agency Standard & Poor's has downgraded the long-term and short-term ratings of Red Eléctrica Corporación, S.A.
Luis Atienza has visited La Junquera to see the tunnel entrance, where a 40-metre gallery has already been excavated, and the tunnel boring machine Alberes that has an overall length of 308 metres
Red Eléctrica de España has created the IRE (Red Eléctrica Index), an indicator whose objective is to facilitate information regarding the evolution electricity consumption of large and medium-size