For 40 years, we've been driving our country's economic and social progress. Four decades shaping Spain.
Red Eléctrica de España has completed the process for assigning the interruptibility service through competitive bidding auctions with the allocation of a total of 8 blocks of 90 megawatts (MW) and
Red Eléctrica de España has transformed its €800 million syndicated loan, signed in 2014, into sustainable financing (‘green financing’) by adding environmental, social and good governance criteria
Red Eléctrica de España has commissioned the enlargement of the AVE (High Speed Train)-Zaragoza power substation, located in the rural district of La Cartuja Baja in the municipality of the capital
Red Eléctrica de España (REE) and Réseau de Transport d'Électricité (RTE), operators of the electricity systems of Spain and France, respectively, have allocated the electricity exchange capacity f

Red Eléctrica Internacional and Engie have commissioned the 500-kilovolt Mejillones-Cardones line which is 600 kilometres in length that connects for the first time ever the the Sistema Interconect

- The programme, developed in collaboration with InnoEnergy, will have a duration of four years and has an initial budget of two million euros.
Red Eléctrica de
Red Eléctrica will undertake a more in-depth geotechnical and geological study of the surveying work carried out in 2012 in order to continue advancing in the Soria-Chira pumped-storage hydroelectr
Red Eléctrica de España has earmarked over two million euros to mark more than 500 kilometres of high-voltage electricity lines with bird-flight diverters.