For 40 years, we've been driving our country's economic and social progress. Four decades shaping Spain.
Red Eléctrica de España has invested 11.8 million euros in the construction of the 220 kilovolt (kV) line that connects the Plaza substation with the 220 kV Entrerríos-Montetorrero line, in order t
- This action strengthens the meshing of the transmission grid between the provinces of Seville and Cadiz.
Red Eléctrica de España has invested 2.3 million euro
Red Eléctrica de España has completed the repowering of the 400 kilovolt (kV) line and 70 kilometres between the substations in Castelnou (Teruel) and Peñaflor, in Villamayor de Gállego (Zaragoza)
This preliminary report presents the provisional statistics regarding the behaviour of the Spanish electricity system during 2017. Close of year conducted with estimated data as at 13 December 2017.

- Renewable technologies contributed 33% to electricity production on the Spanish peninsula due to the lower share of hydro in the generation mix.
The demand fo

- The reforestation with species of laurisilva is included in the ‘Red Eléctrica Forest’ national project
Red Eléctrica de España and the
Red Eléctrica de España has completed the process for assigning the interruptibility service through competitive bidding auctions with the allocation of a total of 8 blocks of 90 megawatts (MW) and
Red Eléctrica de España has transformed its €800 million syndicated loan, signed in 2014, into sustainable financing (‘green financing’) by adding environmental, social and good governance criteria